top of page

Carbon Dioxide And Ammonia Plantroom Installation

Pre-fabricated and installed the majority of the piping systems for a new Carbon Dioxide and Ammonia plantroom.

Working for Excel Engineering, we pre-fabricated and installed the majority of the piping systems for a new Carbon Dioxide and Ammonia plantroom. The project required high-precision fabrication and installation to meet stringent refrigeration standards and tight deadlines. It was constructed from Sch40 Stainless Steel for the carbon dioxide side and Carbon Steel for the Ammonia side.

View more on LinkedIn ›

bottom of page